Fjällsjöälven railway bridge is one of our latest infrastructure projects for which UPB provided production, delivery and assembly (including welding and painting as well as assembly for railings and pedestrian deck).
It weighs about 550 tonnes and is 131 meters long.
General contractor: Rover Group
Client: Trafikverket