In Sollefteå municipality, Sweden, UPB has delivered a new steel bridge, that will improve the historic timber transport railway line, which had become a lifeline for the local forest industry.
The bridge's weight is about 230 tons and it's 83 meters long.
UPB Scope: production, delivery and assembly of steel bridge (including welding and painting as well as assembly for railings and pedestrian deck).
General contractor: Rover Group
Client: Trafikverket